Under construction
Colocation
Liquid cooling
Tier III

NTT GDC Osaka OSK12

NTT GDC · Ibaraki Osaka

Planned IT
36 MW
Free to lease
28.8 MW
$ / kW·mo
$151
White space
72k ft²

Inventory

20% occupied

Power

36 MWlive

28.8 MW to lease · 7.2 MW in use

White space

72k ft²total

58k ft² free · 14k ft² occupied

6,689 m² · 5,351 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease28.8 MW
Utility feed—
Campus / planned36 MW

Power cost

$151/kW·mo

17.2¢ industrial · 20.6¢ after PUE 1.20

Per MW·year
$1.8M
This site · 36 MW
$65M/yr
60 kW rack
$9,040/mo
3.2¢ cheapdear 22.4¢

5.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $53M/yr less.

Japan industrial · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2027
Renewable match
40%
Rack density
60 kW
Voltage
PUE
1.201.00 ideal · 1.60 typical
Power source
Kansai Electric (KEPCO). Dual feeds. Seismically isolated building.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

60 kW

H100-eq

—

WUE

0.72 L/kWh

fleet avg · 2024 · 227k m³/yr at 36 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. NTT DATA GDC 2025 Sustainability Report (FY2024).

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Ibaraki, Osaka, Japan

Ibaraki, Osaka

34.816°, 135.569° · Asia

Tenants / users

Hyperscale, AI

Notes

36 MW first building of NTT GDC's Ibaraki (Osaka) campus, FY2027.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.