Expanding
Colocation
Liquid cooling
Tier III

NTT Amsterdam 1

NTT GDC · Schiphol-Rijk NTT

IT live
21 MW
Free to lease
1.9 MW
$ / kW·mo
$142
White space
341k ft²

Inventory

91% occupied

Power

21 MWlive

1.9 MW to lease · 19.1 MW in use

White space

341k ft²total

11k ft² free · 330k ft² occupied

32k m² · 998 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live21 MW
Free to lease1.9 MW
Utility feed60 MW
Campus / planned40 MW

About 39 MW of the utility feed is cooling, conversion, and house load.

Power cost

$142/kW·mo

15.2¢ industrial · 19.5¢ after PUE 1.28

Per MW·year
$1.7M
This site · 21 MW
$36M/yr
12 kW rack
$1,704/mo
3.2¢ cheapdear 22.4¢

4.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $28M/yr less.

Schiphol-Rijk / Liander · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2019
Renewable match
100%
Rack density
12 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
TenneT / Liander. Dual MV inlets plus on-site diesel. Dutch wind-plus-gas mix; DDA halls buy 100 percent certified green power.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

—

WUE

0.72 L/kWh

fleet avg · 2024 · 132k m³/yr at 21 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. NTT DATA GDC 2025 Sustainability Report (FY2024).

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

11

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Rozenburg, North Holland, Netherlands

Aviolanda 1, 1437 ED Rozenburg

52.278°, 4.742° · Europe

Tenants / users

Hyperscale, cloud, enterprise — 2N UPS, two on-site 60 MVA substations

Notes

7,500-plus sqm live / 20.7 MW IT. Buildings C and D add 9,720 sqm / 22 MW toward 40 MW / 17,200 sqm. Opened April 2019. Next to Digital Realty AMS8/AMS10 Pudongweg.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.