Nostrum Evergreen Badajoz
Nostrum / Evergreen · Badajoz
- Planned IT
- 170 MW
- Free to lease
- 170 MW
- $ / kW·mo
- $105
- White space
- 340k ft²
Inventory
0% occupiedPower
170 MWlive
170 MW to lease · 0 MW in use
White space
340k ft²total
340k ft² free · — occupied
32k m² · 32k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$105/kW·mo
12.2¢ industrial · 14.4¢ after PUE 1.18
- Per MW·year
- $1.3M
- This site · 170 MW
- $214M/yr
- 60 kW rack
- $6,305/mo
3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $158M/yr less.
Spain industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2029
- Renewable match
- 100%
- Rack density
- 60 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- Extremadura solar corridor. Campus could scale toward 1 GW.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
60 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Liquid-ready AI campus. Early-stage pipeline.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Badajoz, Extremadura, Spain
Badajoz, Extremadura
38.879°, -6.970° · Europe
Tenants / users
Hyperscale pipeline
Notes
170 MW first phase, 1 GW end-state discussed. One of Spain's interior solar-powered AI bets.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.