Planned
Colocation
Liquid cooling
Tier III

Nostrum Evergreen Badajoz

Nostrum / Evergreen · Badajoz

Planned IT
170 MW
Free to lease
170 MW
$ / kW·mo
$105
White space
340k ft²

Inventory

0% occupied

Power

170 MWlive

170 MW to lease · 0 MW in use

White space

340k ft²total

340k ft² free · occupied

32k m² · 32k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease170 MW
Utility feed
Campus / planned170 MW

Power cost

$105/kW·mo

12.2¢ industrial · 14.4¢ after PUE 1.18

Per MW·year
$1.3M
This site · 170 MW
$214M/yr
60 kW rack
$6,305/mo
3.2¢ cheapdear 22.4¢

3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $158M/yr less.

Spain industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2029
Renewable match
100%
Rack density
60 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
Extremadura solar corridor. Campus could scale toward 1 GW.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

60 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Liquid-ready AI campus. Early-stage pipeline.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Badajoz, Extremadura, Spain

Badajoz, Extremadura

38.879°, -6.970° · Europe

Tenants / users

Hyperscale pipeline

Notes

170 MW first phase, 1 GW end-state discussed. One of Spain's interior solar-powered AI bets.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.