NorthC Eindhoven 2 Gateway
NorthC · High Tech Gateway
- IT live
- 6 MW
- Free to lease
- 0.5 MW
- $ / kW·mo
- $138
- White space
- 63k ft²
Inventory
91% occupiedPower
6 MWlive
0.5 MW to lease · 5.5 MW in use
White space
63k ft²total
3,375 ft² free · 59k ft² occupied
5,806 m² · 314 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 4 MW of the utility feed is cooling, conversion, and house load.
Power cost
$138/kW·mo
14.8¢ industrial · 18.9¢ after PUE 1.28
- Per MW·year
- $1.7M
- This site · 6 MW
- $10M/yr
- 10 kW rack
- $1,383/mo
4.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $7.8M/yr less.
North Brabant industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2018
- Renewable match
- 100%
- Rack density
- 10 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- TenneT / Liander. Dual MV inlets plus on-site diesel. Dutch wind-plus-gas mix; DDA halls buy 100 percent certified green power.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
10 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
10On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Eindhoven, North Brabant, Netherlands
De Schakel 35, 5651 GH Eindhoven
51.448°, 5.456° · Europe
Tenants / users
Brainport, cloud, enterprise — +1.5 MW May 2026
Notes
Gateway hall. 1.5 MW e-modules and generators landing May 2026. Complements HTC 53.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.