NorthC Amsterdam 2
NorthC · Stekkenbergweg
- IT live
- 4 MW
- Free to lease
- 0.4 MW
- $ / kW·mo
- $146
- White space
- 52k ft²
Inventory
91% occupiedPower
4 MWlive
0.4 MW to lease · 3.6 MW in use
White space
52k ft²total
2,500 ft² free · 50k ft² occupied
4,839 m² · 232 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 3.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$146/kW·mo
15.6¢ industrial · 20¢ after PUE 1.28
- Per MW·year
- $1.7M
- This site · 4 MW
- $7M/yr
- 8 kW rack
- $1,166/mo
4.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $5.6M/yr less.
Amsterdam metro / Liander 50 kV · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2008
- Renewable match
- 100%
- Rack density
- 8 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- TenneT / Liander. Dual MV inlets plus on-site diesel. Dutch wind-plus-gas mix; DDA halls buy 100 percent certified green power.
Cooling
Plant
Hybrid
Liquid
Not deployed
Rack density
8 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Closed-loop chilled water with air-side economizers. No evaporative towers.
Network carriers
11On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Amsterdam, North Holland, Netherlands
Stekkenbergweg 4, 1105 AJ Amsterdam
52.315°, 4.948° · Europe
Tenants / users
Enterprise, cloud, Zuidoost colo
Notes
Former Colt Amsterdam hall, acquired 2025. Upgrading to NorthC N+1 standard; second 2 MW hall 1H 2027. Dual-site with Kabelweg.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.