NorthC Amsterdam 1
NorthC · Kabelweg
- IT live
- 4 MW
- Free to lease
- 0.4 MW
- $ / kW·mo
- $146
- White space
- 39k ft²
Inventory
91% occupiedPower
4 MWlive
0.4 MW to lease · 3.6 MW in use
White space
39k ft²total
2,812 ft² free · 36k ft² occupied
3,629 m² · 261 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 1 MW of the utility feed is cooling, conversion, and house load.
Power cost
$146/kW·mo
15.6¢ industrial · 20¢ after PUE 1.28
- Per MW·year
- $1.7M
- This site · 4 MW
- $7M/yr
- 6 kW rack
- $875/mo
4.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $5.6M/yr less.
Amsterdam metro / Liander 50 kV · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2001
- Renewable match
- 100%
- Rack density
- 6 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- TenneT / Liander. Dual MV inlets plus on-site diesel. Dutch wind-plus-gas mix; DDA halls buy 100 percent certified green power.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
6 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH, N+1. Dutch free-air hours most of the year. Not an AI factory unless noted.
Network carriers
11On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Amsterdam, North Holland, Netherlands
Kabelweg 48a, 1014 BB Amsterdam
52.390°, 4.846° · Europe
Tenants / users
Enterprise, networks, NL-ix, SME colo
Notes
Former NLDC / KPN hall in Westpoort. Region Connect Ring to Aalsmeer, Almere, Oude Meer. Antin Infrastructure acquired NorthC 2025 from DWS.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.