NorthC Almere
NorthC · Almere
- IT live
- 11 MW
- Free to lease
- 1.0 MW
- $ / kW·mo
- $136
- White space
- 109k ft²
Inventory
91% occupiedPower
11 MWlive
1.0 MW to lease · 10.0 MW in use
White space
109k ft²total
6,188 ft² free · 103k ft² occupied
10k m² · 575 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 6.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$136/kW·mo
14.6¢ industrial · 18.7¢ after PUE 1.28
- Per MW·year
- $1.6M
- This site · 11 MW
- $18M/yr
- 10 kW rack
- $1,364/mo
4.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $14M/yr less.
Flevoland industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2009
- Renewable match
- 100%
- Rack density
- 10 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- TenneT / Liander. Dual MV inlets plus on-site diesel. Dutch wind-plus-gas mix; DDA halls buy 100 percent certified green power.
Cooling
Plant
Free air
Liquid
Not deployed
Rack density
10 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Indirect free-air / IDEC most of the year. Closed-loop dry coolers; no evaporative towers on interconnection halls.
Network carriers
10On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Almere, Flevoland, Netherlands
Rondebeltweg 62, 1329 BG Almere
52.351°, 5.264° · Europe
Tenants / users
Enterprise, cloud, Flevoland DR
Notes
11 MW / 7,400 sqm. East of Amsterdam on a different provincial grid. Region Connect Ring dual-site. Rebuilt after the 2024 hall fire.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.