Noovle Settimo Torinese
TIM / Noovle · Cebrosa
- IT live
- 28 MW
- Free to lease
- 2.8 MW
- $ / kW·mo
- $164
- White space
- 313k ft²
Inventory
90% occupiedPower
28 MWlive
2.8 MW to lease · 25.2 MW in use
White space
313k ft²total
18k ft² free · 295k ft² occupied
29k m² · 1,626 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 22 MW of the utility feed is cooling, conversion, and house load.
Power cost
$164/kW·mo
17.6¢ industrial · 22.5¢ after PUE 1.28
- Per MW·year
- $2M
- This site · 28 MW
- $55M/yr
- 10 kW rack
- $1,645/mo
5.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $45M/yr less.
Italy industrial / Piedmont · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2014
- Renewable match
- 50%
- Rack density
- 10 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Terna / Enel. Dual MV inlets plus on-site diesel. Gas-marginal Italian grid.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
10 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Settimo Torinese, Piedmont, Italy
Cebrosa, Settimo Torinese, Turin
45.137°, 7.772° · Europe
Tenants / users
TIM cloud, enterprise, government, north-west DR
Notes
Largest tracked Noovle hall (~813k sqft campus). Turin dual-site with Moncalieri. TIM Sparkle backbone on-net.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.