Noovle Santo Stefano Ticino
TIM / Noovle · Santo Stefano Ticino
- IT live
- 18 MW
- Free to lease
- 1.8 MW
- $ / kW·mo
- $174
- White space
- 219k ft²
Inventory
90% occupiedPower
18 MWlive
1.8 MW to lease · 16.2 MW in use
White space
219k ft²total
11k ft² free · 208k ft² occupied
20k m² · 1,045 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 17 MW of the utility feed is cooling, conversion, and house load.
Power cost
$174/kW·mo
18.6¢ industrial · 23.8¢ after PUE 1.28
- Per MW·year
- $2.1M
- This site · 18 MW
- $38M/yr
- 10 kW rack
- $1,738/mo
5.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $31M/yr less.
Italy industrial / Milan · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2016
- Renewable match
- 45%
- Rack density
- 10 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Terna / Enel. Dual MV inlets plus on-site diesel. Gas-marginal Italian grid.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
10 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Santo Stefano Ticino, Lombardy, Italy
Santo Stefano Ticino, Milan west
45.486°, 8.917° · Europe
Tenants / users
TIM cloud, enterprise, government, hyperscale
Notes
TIM's Noovle Milan-west wholesale. Complements Equinix ML and DATA4 on the west-Milan industrial belt.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.