Expanding
Colocation
Liquid cooling
Tier III

Noovle Santo Stefano Ticino

TIM / Noovle · Santo Stefano Ticino

IT live
18 MW
Free to lease
1.8 MW
$ / kW·mo
$174
White space
219k ft²

Inventory

90% occupied

Power

18 MWlive

1.8 MW to lease · 16.2 MW in use

White space

219k ft²total

11k ft² free · 208k ft² occupied

20k m² · 1,045 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live18 MW
Free to lease1.8 MW
Utility feed35 MW
Campus / planned28 MW

About 17 MW of the utility feed is cooling, conversion, and house load.

Power cost

$174/kW·mo

18.6¢ industrial · 23.8¢ after PUE 1.28

Per MW·year
$2.1M
This site · 18 MW
$38M/yr
10 kW rack
$1,738/mo
3.2¢ cheapdear 22.4¢

5.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $31M/yr less.

Italy industrial / Milan · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2016
Renewable match
45%
Rack density
10 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Terna / Enel. Dual MV inlets plus on-site diesel. Gas-marginal Italian grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

10 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Santo Stefano Ticino, Lombardy, Italy

Santo Stefano Ticino, Milan west

45.486°, 8.917° · Europe

Tenants / users

TIM cloud, enterprise, government, hyperscale

Notes

TIM's Noovle Milan-west wholesale. Complements Equinix ML and DATA4 on the west-Milan industrial belt.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.