Expanding
Colocation
Liquid cooling
Tier III

Noovle Moncalieri

TIM / Noovle · Moncalieri

IT live
12 MW
Free to lease
1.2 MW
$ / kW·mo
$164
White space
125k ft²

Inventory

90% occupied

Power

12 MWlive

1.2 MW to lease · 10.8 MW in use

White space

125k ft²total

7,500 ft² free · 118k ft² occupied

12k m² · 697 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live12 MW
Free to lease1.2 MW
Utility feed20 MW
Campus / planned16 MW

About 8 MW of the utility feed is cooling, conversion, and house load.

Power cost

$164/kW·mo

17.6¢ industrial · 22.5¢ after PUE 1.28

Per MW·year
$2M
This site · 12 MW
$24M/yr
10 kW rack
$1,645/mo
3.2¢ cheapdear 22.4¢

5.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $19M/yr less.

Italy industrial / Piedmont · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2012
Renewable match
50%
Rack density
10 kW
Voltage
PUE
1.281.00 ideal · 1.60 typical
Power source
Terna / Enel. Dual MV inlets plus on-site diesel. Gas-marginal Italian grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

10 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Moncalieri, Piedmont, Italy

Moncalieri, Turin south

44.999°, 7.685° · Europe

Tenants / users

TIM cloud, enterprise, government, north-west DR

Notes

Turin dual-site with Settimo Torinese / Cebrosa already in the index. TIM Sparkle backbone on-net.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.