NJFX Project Cool Water
NJFX · Wall CLS
- Planned IT
- 10 MW
- Free to lease
- 8 MW
- $ / kW·mo
- $133
- White space
- 20k ft²
Inventory
20% occupiedPower
10 MWlive
8 MW to lease · 2 MW in use
White space
20k ft²total
16k ft² free · 4,000 ft² occupied
1,858 m² · 1,486 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$133/kW·mo
14.6¢ industrial · 18.3¢ after PUE 1.25
- Per MW·year
- $1.6M
- This site · 10 MW
- $16M/yr
- 80 kW rack
- $10,658/mo
4.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $12M/yr less.
PSEG / PJM · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2027
- Renewable match
- 40%
- Rack density
- 80 kW
- PUE
- 1.251.00 ideal · 1.60 typical
- Power source
- JCP&L plus diverse fiber from transatlantic cable landings.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
80 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
10 MW high-density AI hall (8 MW usable IT) at a transatlantic cable landing station. Liquid-to-the-chip design, expected PUE 1.25.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Wall Township, New Jersey, United States
Wall Township cable landing station, NJ
40.168°, -74.073° · North America
Tenants / users
AI, networks, finance
Notes
Latency-sensitive AI colo next to subsea cables. Unusual combination of CLS and liquid-cooled GPU halls.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.