Under construction
Colocation
Liquid cooling
Tier III

NJFX Project Cool Water

NJFX · Wall CLS

Planned IT
10 MW
Free to lease
8 MW
$ / kW·mo
$133
White space
20k ft²

Inventory

20% occupied

Power

10 MWlive

8 MW to lease · 2 MW in use

White space

20k ft²total

16k ft² free · 4,000 ft² occupied

1,858 m² · 1,486 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease8 MW
Utility feed—
Campus / planned10 MW

Power cost

$133/kW·mo

14.6¢ industrial · 18.3¢ after PUE 1.25

Per MW·year
$1.6M
This site · 10 MW
$16M/yr
80 kW rack
$10,658/mo
3.2¢ cheapdear 22.4¢

4.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $12M/yr less.

PSEG / PJM · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2027
Renewable match
40%
Rack density
80 kW
PUE
1.251.00 ideal · 1.60 typical
Power source
JCP&L plus diverse fiber from transatlantic cable landings.

Cooling

Plant

Direct-to-chip

Liquid

Deployed

Rack density

80 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

10 MW high-density AI hall (8 MW usable IT) at a transatlantic cable landing station. Liquid-to-the-chip design, expected PUE 1.25.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Wall Township, New Jersey, United States

Wall Township cable landing station, NJ

40.168°, -74.073° · North America

Tenants / users

AI, networks, finance

Notes

Latency-sensitive AI colo next to subsea cables. Unusual combination of CLS and liquid-cooled GPU halls.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.