NEXTDC TK1 Tokyo
NEXTDC · Tokyo

- Planned IT
- 30 MW
- Free to lease
- 30 MW
- $ / kW·mo
- $161
- White space
- 107k ft²
Inventory
0% occupiedPower
30 MWlive
30 MW to lease · 0 MW in use
White space
107k ft²total
107k ft² free · — occupied
9,954 m² · 9,954 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$161/kW·mo
18.4¢ industrial · 22.1¢ after PUE 1.20
- Per MW·year
- $1.9M
- This site · 30 MW
- $58M/yr
- 25 kW rack
- $4,030/mo
5.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $48M/yr less.
TEPCO extra-high voltage · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2028
- Renewable match
- 50%
- Rack density
- 25 kW
- PUE
- 1.201.00 ideal · 1.60 typical
- Power source
- TEPCO. Dual utility feeds. Seismically isolated (免震) building.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
2.40 L/kWh
fleet avg · 2026 · 631k m³/yr at 30 MW
Operator fleet average applied to this hall — not a site meter. NEXTDC FY26 sustainability report.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
9On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Tokyo, Tokyo, Japan
Greater Tokyo
35.670°, 139.770° · Asia
Tenants / users
Enterprise, cloud, AI colo
Notes
NEXTDC's first Japan IBX-style hall, ~30 MW planned.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.