Under construction
Neocloud
Liquid cooling
Tier III

NEXTDC S7 Eastern Creek / OpenAI

NEXTDC / OpenAI · Sydney West

NEXTDC S7 Eastern Creek / OpenAI facility
NEXTDC · Source
Planned IT
550 MW
Remaining
550 MW
$ / kW·mo
$119
White space
1.1M ft²

Inventory

0% occupied

Power

550 MWcampus

550 MW pipeline · 0 MW in use

White space

1.1M ft²total

1.1M ft² free · occupied

102k m² · 102k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live
Remaining550 MW
Utility feed
Campus / planned550 MW

Power cost

$119/kW·mo

14.2¢ industrial · 16.3¢ after PUE 1.15

Per MW·year
$1.4M
This site · 550 MW
$787M/yr
100 kW rack
$11,921/mo
3.2¢ cheapdear 22.4¢

4.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $609M/yr less.

NSW NEM · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2027
Renewable match
80%
Rack density
100 kW
PUE
1.151.00 ideal · 1.60 typical
Power source
Endeavour Energy. A$7bn OpenAI-for-Countries campus.

Cooling

Plant

Direct-to-chip

Liquid

Deployed

Rack density

100 kW

H100-eq

WUE

2.40 L/kWh

fleet avg · 2026 · 12M m³/yr at 550 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. NEXTDC FY26 sustainability report.

GPU supercluster, direct-to-chip. OpenAI is the anchor tenant.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

2

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Eastern Creek, New South Wales, Australia

Eastern Creek, NSW

-33.801°, 150.848° · Oceania

Tenants / users

OpenAI

Notes

612 MW class hyperscale AI campus. Largest committed single Australian AI facility.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.