NEXTDC S7 Eastern Creek / OpenAI
NEXTDC / OpenAI · Sydney West

- Planned IT
- 550 MW
- Remaining
- 550 MW
- $ / kW·mo
- $119
- White space
- 1.1M ft²
Inventory
0% occupiedPower
550 MWcampus
550 MW pipeline · 0 MW in use
White space
1.1M ft²total
1.1M ft² free · — occupied
102k m² · 102k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$119/kW·mo
14.2¢ industrial · 16.3¢ after PUE 1.15
- Per MW·year
- $1.4M
- This site · 550 MW
- $787M/yr
- 100 kW rack
- $11,921/mo
4.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $609M/yr less.
NSW NEM · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2027
- Renewable match
- 80%
- Rack density
- 100 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- Endeavour Energy. A$7bn OpenAI-for-Countries campus.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
100 kW
H100-eq
—
WUE
2.40 L/kWh
fleet avg · 2026 · 12M m³/yr at 550 MW
Operator fleet average applied to this hall — not a site meter. NEXTDC FY26 sustainability report.
GPU supercluster, direct-to-chip. OpenAI is the anchor tenant.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
2Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Eastern Creek, New South Wales, Australia
Eastern Creek, NSW
-33.801°, 150.848° · Oceania
Tenants / users
OpenAI
Notes
612 MW class hyperscale AI campus. Largest committed single Australian AI facility.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.