Operational
Colocation
Liquid cooling
Tier III

NEXTDC S6 Artarmon AI Factory

NEXTDC · Sydney North

NEXTDC S6 Artarmon AI Factory facility
NEXTDC · Source
IT live
13.5 MW
Free to lease
1.6 MW
$ / kW·mo
$119
White space
27k ft²

Inventory

88% occupied

Power

13.5 MWlive

1.6 MW to lease · 11.9 MW in use

White space

27k ft²total

3,240 ft² free · 24k ft² occupied

2,508 m² · 301 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live13.5 MW
Free to lease1.6 MW
Utility feed16.9 MW
Campus / planned13.5 MW

About 3.4 MW of the utility feed is cooling, conversion, and house load.

Power cost

$119/kW·mo

14.2¢ industrial · 16.3¢ after PUE 1.15

Per MW·year
$1.4M
This site · 13.5 MW
$19M/yr
80 kW rack
$9,537/mo
3.2¢ cheapdear 22.4¢

4.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $15M/yr less.

NSW NEM · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2025
Renewable match
80%
Rack density
80 kW
Voltage
PUE
1.151.00 ideal · 1.60 typical
Power source
Ausgrid.

Cooling

Plant

Direct-to-chip

Liquid

Deployed

Rack density

80 kW

H100-eq

WUE

2.40 L/kWh

fleet avg · 2026 · 284k m³/yr at 13.5 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. NEXTDC FY26 sustainability report.

Australia's first purpose-built AI factory. Direct-to-chip, rack densities toward 1 MW.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Artarmon, New South Wales, Australia

Artarmon, NSW

-33.809°, 151.183° · Oceania

Tenants / users

AI clouds, enterprise GPU

Notes

13.5 MW operating AI factory in Artarmon.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.