NEXTDC S6 Artarmon AI Factory
NEXTDC · Sydney North

- IT live
- 13.5 MW
- Free to lease
- 1.6 MW
- $ / kW·mo
- $119
- White space
- 27k ft²
Inventory
88% occupiedPower
13.5 MWlive
1.6 MW to lease · 11.9 MW in use
White space
27k ft²total
3,240 ft² free · 24k ft² occupied
2,508 m² · 301 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 3.4 MW of the utility feed is cooling, conversion, and house load.
Power cost
$119/kW·mo
14.2¢ industrial · 16.3¢ after PUE 1.15
- Per MW·year
- $1.4M
- This site · 13.5 MW
- $19M/yr
- 80 kW rack
- $9,537/mo
4.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $15M/yr less.
NSW NEM · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2025
- Renewable match
- 80%
- Rack density
- 80 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- Ausgrid.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
80 kW
H100-eq
—
WUE
2.40 L/kWh
fleet avg · 2026 · 284k m³/yr at 13.5 MW
Operator fleet average applied to this hall — not a site meter. NEXTDC FY26 sustainability report.
Australia's first purpose-built AI factory. Direct-to-chip, rack densities toward 1 MW.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Artarmon, New South Wales, Australia
Artarmon, NSW
-33.809°, 151.183° · Oceania
Tenants / users
AI clouds, enterprise GPU
Notes
13.5 MW operating AI factory in Artarmon.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.