NEXTDC S4 Horsley Park

NEXTDC · Sydney West

NEXTDC S4 Horsley Park facility
NEXTDC · Source
Planned IT
350 MW
Free to lease
350 MW
$ / kW·mo
$122
White space
729k ft²

Inventory

0% occupied

Power

350 MWlive

350 MW to lease · 0 MW in use

White space

729k ft²total

729k ft² free · occupied

68k m² · 68k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease350 MW
Utility feed
Campus / planned350 MW

Power cost

$122/kW·mo

14.2¢ industrial · 16.8¢ after PUE 1.18

Per MW·year
$1.5M
This site · 350 MW
$514M/yr
50 kW rack
$6,116/mo
3.2¢ cheapdear 22.4¢

4.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $398M/yr less.

NSW NEM · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2028
Renewable match
80%
Rack density
50 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
Endeavour Energy. Part of NEXTDC A$2.2bn capital plan.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

50 kW

H100-eq

WUE

2.40 L/kWh

fleet avg · 2026 · 7.4M m³/yr at 350 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. NEXTDC FY26 sustainability report.

350 MW AI-ready campus.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Horsley Park, New South Wales, Australia

Horsley Park, NSW

-33.840°, 150.850° · Oceania

Tenants / users

Hyperscale, AI

Notes

S4 Horsley Park — 350 MW planned, underwriting NEXTDC's Sydney west buildout.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.