Operational
Colocation
Air cooled
Tier III

NEXTDC P1 Perth

NEXTDC · Perth

NEXTDC P1 Perth facility
NEXTDC · Source
IT live
6 MW
Free to lease
0.7 MW
$ / kW·mo
$119
White space
47k ft²

Inventory

88% occupied

Power

6 MWlive

0.7 MW to lease · 5.3 MW in use

White space

47k ft²total

5,625 ft² free · 41k ft² occupied

4,355 m² · 523 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live6 MW
Free to lease0.7 MW
Utility feed7.5 MW
Campus / planned6 MW

About 1.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$119/kW·mo

12.4¢ industrial · 16.4¢ after PUE 1.32

Per MW·year
$1.4M
This site · 6 MW
$8.6M/yr
6 kW rack
$717/mo
3.2¢ cheapdear 22.4¢

3.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $6.4M/yr less.

SWIS · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2014
Renewable match
50%
Rack density
6 kW
Voltage
PUE
1.321.00 ideal · 1.60 typical
Power source
Western Power.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

6 kW

H100-eq

WUE

2.40 L/kWh

fleet avg · 2026 · 126k m³/yr at 6 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. NEXTDC FY26 sustainability report.

Air-cooled. SUBCO subsea cable adjacency via Perth.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Perth, Western Australia, Australia

Perth, WA

-31.950°, 115.860° · Oceania

Tenants / users

Enterprise, mining, government

Notes

Perth interconnection. P2 and CDC Hazelmere are the scale-up path.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.