Under construction
Colocation
Liquid cooling
Tier III

NEXTDC M4 Fishermans Bend

NEXTDC · Melbourne AI Factory

NEXTDC M4 Fishermans Bend facility
NEXTDC · Source
Planned IT
162 MW
Free to lease
130 MW
$ / kW·mo
$113
White space
324k ft²

Inventory

20% occupied

Power

162 MWlive

130 MW to lease · 32.4 MW in use

White space

324k ft²total

259k ft² free · 65k ft² occupied

30k m² · 24k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease130 MW
Utility feed
Campus / planned162 MW

Power cost

$113/kW·mo

13.8¢ industrial · 15.5¢ after PUE 1.12

Per MW·year
$1.4M
This site · 162 MW
$219M/yr
120 kW rack
$13,539/mo
3.2¢ cheapdear 22.4¢

4.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $168M/yr less.

Victoria NEM · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2028
Renewable match
80%
Rack density
120 kW
PUE
1.121.00 ideal · 1.60 typical
Power source
CitiPower. A$2bn DA-approved January 2026.

Cooling

Plant

Direct-to-chip

Liquid

Deployed

Rack density

120 kW

H100-eq

WUE

2.40 L/kWh

fleet avg · 2026 · 3.4M m³/yr at 162 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. NEXTDC FY26 sustainability report.

Direct-to-chip, rack densities exceeding 1,000 kW. Sovereign AI / defence workloads.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Port Melbourne, Victoria, Australia

Fishermans Bend, Port Melbourne, VIC

-37.843°, 144.932° · Oceania

Tenants / users

AI, defence, sovereign

Notes

Australia's most ambitious single-site AI factory. 162 MW, Fishermans Bend.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.