Operational
Colocation
Liquid cooling
Tier III

NEXTDC M2 Melbourne

NEXTDC · Melbourne

NEXTDC M2 Melbourne facility
NEXTDC · Source
IT live
40 MW
Free to lease
5.2 MW
$ / kW·mo
$126
White space
200k ft²

Inventory

87% occupied

Power

40 MWlive

5.2 MW to lease · 34.8 MW in use

White space

200k ft²total

26k ft² free · 174k ft² occupied

19k m² · 2,415 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live40 MW
Free to lease5.2 MW
Utility feed100 MW
Campus / planned80 MW

About 60 MW of the utility feed is cooling, conversion, and house load.

Power cost

$126/kW·mo

13.8¢ industrial · 17.3¢ after PUE 1.25

Per MW·year
$1.5M
This site · 40 MW
$60M/yr
15 kW rack
$1,889/mo
3.2¢ cheapdear 22.4¢

4.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $46M/yr less.

Victoria NEM · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2017
Renewable match
60%
Rack density
15 kW
PUE
1.251.00 ideal · 1.60 typical
Power source
CitiPower.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

15 kW

H100-eq

WUE

2.40 L/kWh

fleet avg · 2026 · 841k m³/yr at 40 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. NEXTDC FY26 sustainability report.

Wholesale plus interconnection. Liquid-ready halls.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Melbourne, Victoria, Australia

Port Melbourne / CBD fringe, VIC

-37.820°, 144.950° · Oceania

Tenants / users

Cloud, enterprise

Notes

Second Melbourne NEXTDC building, scaling with M3 toward 225 MW by 2027.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.