Operational
Colocation
Air cooled
Tier III

NEXTDC M1

NEXTDC · Melbourne

NEXTDC M1 facility
NEXTDC · Source
IT live
20 MW
Free to lease
2.6 MW
$ / kW·mo
$141
White space
167k ft²

Inventory

87% occupied

Power

20 MWlive

2.6 MW to lease · 17.4 MW in use

White space

167k ft²total

22k ft² free · 145k ft² occupied

15k m² · 2,013 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live20 MW
Free to lease2.6 MW
Utility feed30 MW
Campus / planned30 MW

About 10 MW of the utility feed is cooling, conversion, and house load.

Power cost

$141/kW·mo

13.8¢ industrial · 19.3¢ after PUE 1.40

Per MW·year
$1.7M
This site · 20 MW
$34M/yr
5 kW rack
$705/mo
3.2¢ cheapdear 22.4¢

4.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $26M/yr less.

Victoria NEM · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2011
Renewable match
40%
Rack density
5 kW
Voltage
PUE
1.401.00 ideal · 1.60 typical
Power source
CitiPower.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

5 kW

H100-eq

WUE

2.40 L/kWh

fleet avg · 2026 · 420k m³/yr at 20 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. NEXTDC FY26 sustainability report.

Chilled-water CRAH. CBD interconnection; N on N+1 UPS.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Melbourne, Victoria, Australia

Port Melbourne / CBD fringe

-37.814°, 144.963° · Oceania

Tenants / users

Enterprise, cloud

Notes

NEXTDC's original Melbourne interconnection site.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.