NEXTDC M1
NEXTDC · Melbourne

- IT live
- 20 MW
- Free to lease
- 2.6 MW
- $ / kW·mo
- $141
- White space
- 167k ft²
Inventory
87% occupiedPower
20 MWlive
2.6 MW to lease · 17.4 MW in use
White space
167k ft²total
22k ft² free · 145k ft² occupied
15k m² · 2,013 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 10 MW of the utility feed is cooling, conversion, and house load.
Power cost
$141/kW·mo
13.8¢ industrial · 19.3¢ after PUE 1.40
- Per MW·year
- $1.7M
- This site · 20 MW
- $34M/yr
- 5 kW rack
- $705/mo
4.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $26M/yr less.
Victoria NEM · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2011
- Renewable match
- 40%
- Rack density
- 5 kW
- PUE
- 1.401.00 ideal · 1.60 typical
- Power source
- CitiPower.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
5 kW
H100-eq
—
WUE
2.40 L/kWh
fleet avg · 2026 · 420k m³/yr at 20 MW
Operator fleet average applied to this hall — not a site meter. NEXTDC FY26 sustainability report.
Chilled-water CRAH. CBD interconnection; N on N+1 UPS.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Melbourne, Victoria, Australia
Port Melbourne / CBD fringe
-37.814°, 144.963° · Oceania
Tenants / users
Enterprise, cloud
Notes
NEXTDC's original Melbourne interconnection site.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.