NEXTDC AK1 Auckland
NEXTDC · AK1

- Planned IT
- 15 MW
- Free to lease
- 15 MW
- $ / kW·mo
- $79
- White space
- 63k ft²
Inventory
0% occupiedPower
15 MWlive
15 MW to lease · 0 MW in use
White space
63k ft²total
63k ft² free · — occupied
5,806 m² · 5,806 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$79/kW·mo
9.2¢ industrial · 10.9¢ after PUE 1.18
- Per MW·year
- $951k
- This site · 15 MW
- $14M/yr
- 20 kW rack
- $1,585/mo
2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $9.3M/yr less.
Vector / NZAS-linked · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2027
- Renewable match
- 85%
- Rack density
- 20 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- Vector / Transpower. Dual feeds plus on-site generators. ~85 percent renewable NZ grid.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
2.40 L/kWh
fleet avg · 2026 · 315k m³/yr at 15 MW
Operator fleet average applied to this hall — not a site meter. NEXTDC FY26 sustainability report.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Auckland, Auckland, New Zealand
Auckland, New Zealand
-36.740°, 174.701° · Oceania
Tenants / users
Cloud, enterprise, networks — AXON
Notes
NEXTDC's first NZ IBX. 10 MW scaling to 15 MW, 3,000 m2, Uptime Tier IV target. Low-latency mesh to S1/S2 Sydney and the rest of the Australian AXON fabric.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.