Anthropic–Amazon New Carlisle
Amazon Web Services · Project Rainier
- IT live
- 910 MW
- Remaining
- 1.3 GW
- $ / kW·mo
- $62
- White space
- 1.8M ft²
Inventory
41% occupiedPower
2.2 GWcampus
1.3 GW to commission · 910 MW in use
White space
4.4M ft²total
2.6M ft² free · 1.8M ft² occupied
409k m² · 240k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 1.3 GW of the utility feed is cooling, conversion, and house load.
Power cost
$62/kW·mo
7.4¢ industrial · 8.5¢ after PUE 1.15
- Per MW·year
- $745k
- This site · 910 MW
- $678M/yr
- 100 kW rack
- $6,212/mo
2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $385M/yr less.
Indiana industrial · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2025
- Renewable match
- 40%
- Rack density
- 100 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- AEP Indiana Michigan grid plus on-site generation pipeline.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
100 kW
H100-eq
686k
WUE
0.12 L/kWh
fleet avg · 2025 · 957k m³/yr at 910 MW
Operator fleet average applied to this hall — not a site meter. AWS 2025 sustainability disclosure.
Liquid-cooled Trainium2 and NVIDIA halls dedicated to Anthropic training. Campus planned toward 2.2 GW.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
New Carlisle, Indiana, United States
New Carlisle, St. Joseph County, IN
41.701°, -86.509° · North America
Tenants / users
Anthropic, AWS
Notes
Project Rainier is AWS's dedicated Anthropic training campus in northern Indiana.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.