Expanding
Colocation
Liquid cooling
Tier III

NeutraDC Cikarang

NeutraDC (Telkom) · GIIC Cikarang

IT live
24 MW
Free to lease
4.3 MW
$ / kW·mo
$84
White space
625k ft²

Inventory

82% occupied

Power

24 MWlive

4.3 MW to lease · 19.7 MW in use

White space

625k ft²total

18k ft² free · 607k ft² occupied

58k m² · 1,672 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live24 MW
Free to lease4.3 MW
Utility feed150 MW
Campus / planned120 MW

About 126 MW of the utility feed is cooling, conversion, and house load.

Power cost

$84/kW·mo

9.2¢ industrial · 11.5¢ after PUE 1.25

Per MW·year
$1M
This site · 24 MW
$24M/yr
20 kW rack
$1,679/mo
3.2¢ cheapdear 22.4¢

2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $16M/yr less.

PLN · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2024
Renewable match
20%
Rack density
20 kW
PUE
1.251.00 ideal · 1.60 typical
Power source
PLN. Dual municipal feeds plus on-site generators.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Cikarang, West Java, Indonesia

GIIC Deltamas, Cikarang

-6.319°, 107.142° · Asia

Tenants / users

Hyperscale, AI, cloud

Notes

Hyperscale campus. 120 MW design, AI-ready, dual power houses. Complements STT on the same industrial estate.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.