NeutraDC Cikarang
NeutraDC (Telkom) · GIIC Cikarang
- IT live
- 24 MW
- Free to lease
- 4.3 MW
- $ / kW·mo
- $84
- White space
- 625k ft²
Inventory
82% occupiedPower
24 MWlive
4.3 MW to lease · 19.7 MW in use
White space
625k ft²total
18k ft² free · 607k ft² occupied
58k m² · 1,672 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 126 MW of the utility feed is cooling, conversion, and house load.
Power cost
$84/kW·mo
9.2¢ industrial · 11.5¢ after PUE 1.25
- Per MW·year
- $1M
- This site · 24 MW
- $24M/yr
- 20 kW rack
- $1,679/mo
2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $16M/yr less.
PLN · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2024
- Renewable match
- 20%
- Rack density
- 20 kW
- PUE
- 1.251.00 ideal · 1.60 typical
- Power source
- PLN. Dual municipal feeds plus on-site generators.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Cikarang, West Java, Indonesia
GIIC Deltamas, Cikarang
-6.319°, 107.142° · Asia
Tenants / users
Hyperscale, AI, cloud
Notes
Hyperscale campus. 120 MW design, AI-ready, dual power houses. Complements STT on the same industrial estate.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.