Operational
Hyperscale
Liquid cooling
Tier III

Naver Gak Chuncheon

Naver Cloud · Chuncheon

IT live
40 MW
Remaining
20 MW
$ / kW·mo
$93
White space
167k ft²

Inventory

67% occupied

Power

60 MWcampus

20 MW to commission · 40 MW in use

White space

250k ft²total

83k ft² free · 167k ft² occupied

23k m² · 7,742 m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live40 MW
Remaining20 MW
Utility feed75 MW
Campus / planned60 MW

About 35 MW of the utility feed is cooling, conversion, and house load.

Power cost

$93/kW·mo

10.6¢ industrial · 12.7¢ after PUE 1.20

Per MW·year
$1.1M
This site · 40 MW
$45M/yr
20 kW rack
$1,857/mo
3.2¢ cheapdear 22.4¢

3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $31M/yr less.

KEPCO industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2013
Renewable match
40%
Rack density
20 kW
PUE
1.201.00 ideal · 1.60 typical
Power source
KEPCO. Dual utility feeds.

Cooling

Plant

Free air

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Gangwon free-air economization plus liquid loops on AI halls. Named 각 (Gak).

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Chuncheon, Gangwon, South Korea

Chuncheon, Gangwon

37.881°, 127.730° · Asia

Tenants / users

Naver, NAVER Cloud

Notes

Naver's first purpose-built DC. Cool-climate Gangwon campus.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.