Operational
Colocation
Air cooled
Tier III

Nabiax Terrassa

Nabiax · Barcelona

IT live
1.3 MW
Free to lease
0.2 MW
$ / kW·mo
$126
White space
11k ft²

Inventory

86% occupied

Power

1.3 MWlive

0.2 MW to lease · 1.1 MW in use

White space

11k ft²total

1,500 ft² free · 9,333 ft² occupied

1,006 m² · 139 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live1.3 MW
Free to lease0.2 MW
Utility feed1.6 MW
Campus / planned1.3 MW

About 0.3 MW of the utility feed is cooling, conversion, and house load.

Power cost

$126/kW·mo

12.2¢ industrial · 17.3¢ after PUE 1.42

Per MW·year
$1.5M
This site · 1.3 MW
$2M/yr
5 kW rack
$632/mo
3.2¢ cheapdear 22.4¢

3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $1.5M/yr less.

Spain industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2008
Renewable match
50%
Rack density
5 kW
Voltage
PUE
1.421.00 ideal · 1.60 typical
Power source
Catalan grid.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

5 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Small air-cooled Barcelona-metro hall.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Terrassa, Catalonia, Spain

Terrassa, Barcelona

41.563°, 2.008° · Europe

Tenants / users

Enterprise, networks

Notes

1.3 MW Terrassa facility — Nabiax Catalonia presence.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.