Under construction
Colocation
Liquid cooling
Tier III

Nabiax ADC3 Alcalá

Nabiax · Alcalá de Henares

Planned IT
100 MW
Free to lease
80 MW
$ / kW·mo
$107
White space
250k ft²

Inventory

20% occupied

Power

100 MWlive

80 MW to lease · 20 MW in use

White space

250k ft²total

200k ft² free · 50k ft² occupied

23k m² · 19k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease80 MW
Utility feed
Campus / planned100 MW

Power cost

$107/kW·mo

12.2¢ industrial · 14.6¢ after PUE 1.20

Per MW·year
$1.3M
This site · 100 MW
$128M/yr
40 kW rack
$4,275/mo
3.2¢ cheapdear 22.4¢

3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $95M/yr less.

Spain industrial · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2029
Renewable match
90%
Rack density
40 kW
PUE
1.201.00 ideal · 1.60 typical
Power source
Redeia substation >100 MW dedicated to the campus. €800m Ferrovial build.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

40 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

AI-ready liquid halls, phased to 100 MW IT by 2029.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Alcalá de Henares, Madrid, Spain

Alcalá de Henares, Madrid

40.484°, -3.360° · Europe

Tenants / users

Hyperscale, AI clouds

Notes

Fifth Nabiax Madrid CPD. Pushes Spanish footprint toward 135–140 MW. 1,000 jobs claimed at peak.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.