Nabiax ADC1 Alcalá
Nabiax · Alcalá de Henares
- IT live
- 10 MW
- Free to lease
- 1.4 MW
- $ / kW·mo
- $120
- White space
- 69k ft²
Inventory
86% occupiedPower
10 MWlive
1.4 MW to lease · 8.6 MW in use
White space
69k ft²total
9,722 ft² free · 60k ft² occupied
6,452 m² · 903 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 2.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$120/kW·mo
12.2¢ industrial · 16.5¢ after PUE 1.35
- Per MW·year
- $1.4M
- This site · 10 MW
- $14M/yr
- 8 kW rack
- $962/mo
3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $11M/yr less.
Spain industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2013
- Renewable match
- 70%
- Rack density
- 8 kW
- PUE
- 1.351.00 ideal · 1.60 typical
- Power source
- Red Eléctrica / Redeia.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
8 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH. Liquid-ready expansion on ADC3.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Alcalá de Henares, Madrid, Spain
Alcalá de Henares, Madrid
40.482°, -3.364° · Europe
Tenants / users
Telefónica heritage, cloud, enterprise
Notes
Original Alcalá hall (Telefónica spin-off). Campus with ADC2 totals ~22 MW before ADC3.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.