Operational
Colocation
Air cooled
Tier III

Nabiax ADC1 Alcalá

Nabiax · Alcalá de Henares

IT live
10 MW
Free to lease
1.4 MW
$ / kW·mo
$120
White space
69k ft²

Inventory

86% occupied

Power

10 MWlive

1.4 MW to lease · 8.6 MW in use

White space

69k ft²total

9,722 ft² free · 60k ft² occupied

6,452 m² · 903 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live10 MW
Free to lease1.4 MW
Utility feed12.5 MW
Campus / planned10 MW

About 2.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$120/kW·mo

12.2¢ industrial · 16.5¢ after PUE 1.35

Per MW·year
$1.4M
This site · 10 MW
$14M/yr
8 kW rack
$962/mo
3.2¢ cheapdear 22.4¢

3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $11M/yr less.

Spain industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2013
Renewable match
70%
Rack density
8 kW
Voltage
PUE
1.351.00 ideal · 1.60 typical
Power source
Red Eléctrica / Redeia.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

8 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH. Liquid-ready expansion on ADC3.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Alcalá de Henares, Madrid, Spain

Alcalá de Henares, Madrid

40.482°, -3.364° · Europe

Tenants / users

Telefónica heritage, cloud, enterprise

Notes

Original Alcalá hall (Telefónica spin-off). Campus with ADC2 totals ~22 MW before ADC3.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.