Expanding
Colocation
Air cooled
Tier III

MTS Avantage

MTS Web Services · Avantage

IT live
10 MW
Free to lease
1.4 MW
$ / kW·mo
$53
White space
122k ft²

Inventory

86% occupied

Power

10 MWlive

1.4 MW to lease · 8.6 MW in use

White space

122k ft²total

9,722 ft² free · 112k ft² occupied

11k m² · 903 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live10 MW
Free to lease1.4 MW
Utility feed17.5 MW
Campus / planned14 MW

About 7.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$53/kW·mo

5.6¢ industrial · 7.3¢ after PUE 1.30

Per MW·year
$638k
This site · 10 MW
$6.4M/yr
8 kW rack
$425/mo
3.2¢ cheapdear 22.4¢

1.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $2.7M/yr less.

Mosenergosbyt · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2015
Renewable match
18%
Rack density
8 kW
Voltage
PUE
1.301.00 ideal · 1.60 typical
Power source
MOESK / Mosenergosbyt. Dual 10 kV inlets plus on-site diesel. Gas-heavy Moscow grid; nuclear from Rosenergoatom on the ring.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

8 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Isolated hot aisles. Not an AI factory unless noted.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Moscow, Moscow, Russia

Moscow

55.709°, 37.615° · Europe

Tenants / users

MWS cloud, MTS, enterprise

Notes

MTS / MWS hall. CNews 2025: 3,483 racks. Telco-cloud colo for the MTS group.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.