Microsoft Azure Finland Vaasa
Microsoft Azure · Vaasa
- Planned IT
- 150 MW
- Remaining
- 150 MW
- $ / kW·mo
- $51
- White space
- 469k ft²
Inventory
0% occupiedPower
150 MWcampus
150 MW pipeline · 0 MW in use
White space
469k ft²total
469k ft² free · — occupied
44k m² · 44k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$51/kW·mo
6.2¢ industrial · 6.9¢ after PUE 1.12
- Per MW·year
- $608k
- This site · 150 MW
- $91M/yr
- 30 kW rack
- $1,521/mo
1.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $44M/yr less.
Finland Ostrobothnia · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2028
- Renewable match
- 100%
- Rack density
- 30 kW
- PUE
- 1.121.00 ideal · 1.60 typical
- Power source
- Fingrid. Dual feeds. Nuclear (Olkiluoto 3) plus hydro and wind.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
30 kW
H100-eq
—
WUE
0.27 L/kWh
fleet avg · 2025 · 355k m³/yr at 150 MW
Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Vaasa, Ostrobothnia, Finland
Vaasa, Ostrobothnia
63.096°, 21.616° · Europe
Tenants / users
Azure
Notes
Microsoft 3465 Finland Oy campus. Construction start tracked 2026. West-coast wind plus nuclear. Complements Sweden Central and Hamina in the Nordic cloud set.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.