Planned
Hyperscale
Liquid cooling
Tier III

Microsoft Azure Finland Vaasa

Microsoft Azure · Vaasa

Planned IT
150 MW
Remaining
150 MW
$ / kW·mo
$51
White space
469k ft²

Inventory

0% occupied

Power

150 MWcampus

150 MW pipeline · 0 MW in use

White space

469k ft²total

469k ft² free · occupied

44k m² · 44k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live
Remaining150 MW
Utility feed
Campus / planned150 MW

Power cost

$51/kW·mo

6.2¢ industrial · 6.9¢ after PUE 1.12

Per MW·year
$608k
This site · 150 MW
$91M/yr
30 kW rack
$1,521/mo
3.2¢ cheapdear 22.4¢

1.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $44M/yr less.

Finland Ostrobothnia · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2028
Renewable match
100%
Rack density
30 kW
PUE
1.121.00 ideal · 1.60 typical
Power source
Fingrid. Dual feeds. Nuclear (Olkiluoto 3) plus hydro and wind.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

30 kW

H100-eq

WUE

0.27 L/kWh

fleet avg · 2025 · 355k m³/yr at 150 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Vaasa, Ostrobothnia, Finland

Vaasa, Ostrobothnia

63.096°, 21.616° · Europe

Tenants / users

Azure

Notes

Microsoft 3465 Finland Oy campus. Construction start tracked 2026. West-coast wind plus nuclear. Complements Sweden Central and Hamina in the Nordic cloud set.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.