Operational
Hyperscale
Liquid cooling
Tier III

Microsoft UK West Cardiff

Microsoft Azure · Cardiff

IT live
40 MW
Remaining
20 MW
$ / kW·mo
$151
White space
143k ft²

Inventory

67% occupied

Power

60 MWcampus

20 MW to commission · 40 MW in use

White space

214k ft²total

71k ft² free · 143k ft² occupied

20k m² · 6,636 m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live40 MW
Remaining20 MW
Utility feed75 MW
Campus / planned60 MW

About 35 MW of the utility feed is cooling, conversion, and house load.

Power cost

$151/kW·mo

17.8¢ industrial · 20.6¢ after PUE 1.16

Per MW·year
$1.8M
This site · 40 MW
$72M/yr
25 kW rack
$3,768/mo
3.2¢ cheapdear 22.4¢

5.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $59M/yr less.

Wales industrial · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2015
Renewable match
80%
Rack density
25 kW
Voltage
PUE
1.161.00 ideal · 1.60 typical
Power source
National Grid Wales plus Microsoft PPAs.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

0.27 L/kWh

fleet avg · 2025 · 95k m³/yr at 40 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

7

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Cardiff, Wales, United Kingdom

Cardiff, Wales

51.481°, -3.179° · Europe

Tenants / users

Azure

Notes

Azure UK West. South Wales hydro/wind-adjacent region pair to UK South.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.