Operational
Hyperscale
Liquid cooling
Tier III

Microsoft Taiwan North

Microsoft Azure · Taiwan Cloud Region

IT live
36 MW
Remaining
24 MW
$ / kW·mo
$77
White space
113k ft²

Inventory

60% occupied

Power

60 MWcampus

24 MW to commission · 36 MW in use

White space

188k ft²total

75k ft² free · 113k ft² occupied

17k m² · 6,968 m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live36 MW
Remaining24 MW
Utility feed75 MW
Campus / planned60 MW

About 39 MW of the utility feed is cooling, conversion, and house load.

Power cost

$77/kW·mo

9.2¢ industrial · 10.6¢ after PUE 1.15

Per MW·year
$927k
This site · 36 MW
$33M/yr
30 kW rack
$2,317/mo
3.2¢ cheapdear 22.4¢

2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $22M/yr less.

Taipower · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2024
Renewable match
25%
Rack density
30 kW
PUE
1.151.00 ideal · 1.60 typical
Power source
Taipower. Dual feeds. Seismic design.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

30 kW

H100-eq

WUE

0.27 L/kWh

fleet avg · 2025 · 85k m³/yr at 36 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Taipei, Taipei, Taiwan

Northern Taiwan metro

25.030°, 121.500° · Asia

Tenants / users

Azure

Notes

Azure Taiwan North. Microsoft's first Taiwan cloud region.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.