Microsoft Silver Springs
Microsoft
- Planned IT
- —
- Remaining
- —
- $ / kW·mo
- $70
- White space
- —
Power
Power cost
$70/kW·mo
7.4¢ industrial · 9.6¢ after PUE —
- Per MW·year
- $843k
- This site
- —
2.3× the cheapest market (Iceland Landsvirkjun).
NV Energy · utility tariff × PUE, not colo list price.
- Redundancy
- —
- Opened
- —
- Renewable match
- —
- Rack density
- —
- Voltage
- —
- PUE
- —1.00 ideal · 1.60 typical
- Power source
- —
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
—
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Cooling design not published by the operator for this site; typed air as the neutral default.
Network carriers
0No on-net carriers published.
On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
0No public-cloud on-ramp published.
Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Silver Springs, Nevada, United States
39.415°, -119.225° · North America
Tenants / users
Microsoft
Notes
Microsoft says early construction (site prep, earthwork, utility relocation) started at its Silver Springs datacenter site in Sep 2026; general contractor Q&D Construction; multi-year build. Capacity not published. Coordinates: Silver Springs town center (approximate). Source: https://local.microsoft.com/blog/silver-springs-datacenter-construction-update/
Compiled from public filings, operator pages, and reporting. Not an official operator specification.