Under construction
Hyperscale
Air cooled

Microsoft Silver Springs

Microsoft

Planned IT
—
Remaining
—
$ / kW·mo
$70
White space
—

Power

IT live—
Remaining—
Utility feed—
Campus / planned—

Power cost

$70/kW·mo

7.4¢ industrial · 9.6¢ after PUE —

Per MW·year
$843k
This site
—
3.2¢ cheapdear 22.4¢

2.3× the cheapest market (Iceland Landsvirkjun).

NV Energy · utility tariff × PUE, not colo list price.

Redundancy
—
Opened
—
Renewable match
—
Rack density
—
Voltage
—
PUE
—1.00 ideal · 1.60 typical
Power source
—

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

—

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Cooling design not published by the operator for this site; typed air as the neutral default.

Network carriers

0

No on-net carriers published.

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

0

No public-cloud on-ramp published.

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Silver Springs, Nevada, United States

39.415°, -119.225° · North America

Tenants / users

Microsoft

Notes

Microsoft says early construction (site prep, earthwork, utility relocation) started at its Silver Springs datacenter site in Sep 2026; general contractor Q&D Construction; multi-year build. Capacity not published. Coordinates: Silver Springs town center (approximate). Source: https://local.microsoft.com/blog/silver-springs-datacenter-construction-update/

Operator site