Microsoft São Paulo
Microsoft Azure · Brazil South
- IT live
- 80 MW
- Remaining
- 420 MW
- $ / kW·mo
- $84
- White space
- 250k ft²
Inventory
16% occupiedPower
500 MWcampus
420 MW to commission · 80 MW in use
White space
1.6M ft²total
1.3M ft² free · 250k ft² occupied
145k m² · 122k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 545 MW of the utility feed is cooling, conversion, and house load.
Power cost
$84/kW·mo
9.8¢ industrial · 11.6¢ after PUE 1.18
- Per MW·year
- $1M
- This site · 80 MW
- $81M/yr
- 30 kW rack
- $2,533/mo
3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $55M/yr less.
CPFL Campinas · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2014
- Renewable match
- 90%
- Rack density
- 30 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- Brazilian hydro plus Microsoft PPAs. BRL 14.7bn GPU-density commitment.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
30 kW
H100-eq
—
WUE
0.27 L/kWh
fleet avg · 2025 · 189k m³/yr at 80 MW
Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.
Self-build shift from leased colo. Closed-loop liquid on new AI halls.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Campinas, São Paulo, Brazil
Greater São Paulo / Campinas, Brazil
-22.910°, -47.060° · South America
Tenants / users
Azure
Notes
Microsoft Brazil region expanding toward 500 MW tracked AI/cloud IT.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.