Microsoft São Paulo

Microsoft Azure · Brazil South

IT live
80 MW
Remaining
420 MW
$ / kW·mo
$84
White space
250k ft²

Inventory

16% occupied

Power

500 MWcampus

420 MW to commission · 80 MW in use

White space

1.6M ft²total

1.3M ft² free · 250k ft² occupied

145k m² · 122k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live80 MW
Remaining420 MW
Utility feed625 MW
Campus / planned500 MW

About 545 MW of the utility feed is cooling, conversion, and house load.

Power cost

$84/kW·mo

9.8¢ industrial · 11.6¢ after PUE 1.18

Per MW·year
$1M
This site · 80 MW
$81M/yr
30 kW rack
$2,533/mo
3.2¢ cheapdear 22.4¢

3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $55M/yr less.

CPFL Campinas · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2014
Renewable match
90%
Rack density
30 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
Brazilian hydro plus Microsoft PPAs. BRL 14.7bn GPU-density commitment.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

30 kW

H100-eq

WUE

0.27 L/kWh

fleet avg · 2025 · 189k m³/yr at 80 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.

Self-build shift from leased colo. Closed-loop liquid on new AI halls.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Campinas, São Paulo, Brazil

Greater São Paulo / Campinas, Brazil

-22.910°, -47.060° · South America

Tenants / users

Azure

Notes

Microsoft Brazil region expanding toward 500 MW tracked AI/cloud IT.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.