Microsoft Azure Poland Central
Microsoft Azure · Poland Central
- IT live
- 80 MW
- Remaining
- 100 MW
- $ / kW·mo
- $103
- White space
- 804k ft²
Inventory
44% occupiedPower
180 MWcampus
100 MW to commission · 80 MW in use
White space
1.8M ft²total
1M ft² free · 804k ft² occupied
168k m² · 93k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 145 MW of the utility feed is cooling, conversion, and house load.
Power cost
$103/kW·mo
12¢ industrial · 14.2¢ after PUE 1.18
- Per MW·year
- $1.2M
- This site · 80 MW
- $99M/yr
- 25 kW rack
- $2,584/mo
3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $73M/yr less.
PGE / TGE · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2023
- Renewable match
- 60%
- Rack density
- 25 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- PGE / PSE. Dual 15 kV inlets plus on-site diesel. Coal-to-wind Polish grid.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Warsaw, Mazovia, Poland
Greater Warsaw / Jawczyce corridor
52.148°, 20.852° · Europe
Tenants / users
Azure
Notes
Azure Poland Central, the CEE cloud region. Live campus expanding; additional AI halls under construction. Not the 500 MW tracked end-state.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.