Expanding
Hyperscale
Liquid cooling
Tier III

Microsoft Azure Poland Central

Microsoft Azure · Poland Central

IT live
80 MW
Remaining
100 MW
$ / kW·mo
$103
White space
804k ft²

Inventory

44% occupied

Power

180 MWcampus

100 MW to commission · 80 MW in use

White space

1.8M ft²total

1M ft² free · 804k ft² occupied

168k m² · 93k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live80 MW
Remaining100 MW
Utility feed225 MW
Campus / planned180 MW

About 145 MW of the utility feed is cooling, conversion, and house load.

Power cost

$103/kW·mo

12¢ industrial · 14.2¢ after PUE 1.18

Per MW·year
$1.2M
This site · 80 MW
$99M/yr
25 kW rack
$2,584/mo
3.2¢ cheapdear 22.4¢

3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $73M/yr less.

PGE / TGE · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2023
Renewable match
60%
Rack density
25 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
PGE / PSE. Dual 15 kV inlets plus on-site diesel. Coal-to-wind Polish grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Warsaw, Mazovia, Poland

Greater Warsaw / Jawczyce corridor

52.148°, 20.852° · Europe

Tenants / users

Azure

Notes

Azure Poland Central, the CEE cloud region. Live campus expanding; additional AI halls under construction. Not the 500 MW tracked end-state.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.