Microsoft Pecos Campus
Microsoft Azure · Pecos
- Planned IT
- 2 GW
- Remaining
- 2 GW
- $ / kW·mo
- $54
- White space
- 4M ft²
Inventory
0% occupiedPower
2 GWcampus
2 GW pipeline · 0 MW in use
White space
4M ft²total
4M ft² free · — occupied
372k m² · 372k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$54/kW·mo
6.6¢ industrial · 7.4¢ after PUE 1.12
- Per MW·year
- $648k
- This site · 2 GW
- $1.3B/yr
- 140 kW rack
- $7,555/mo
2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $667M/yr less.
ERCOT industrial · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2028
- Renewable match
- 70%
- Rack density
- 140 kW
- PUE
- 1.121.00 ideal · 1.60 typical
- Power source
- ERCOT West plus PPAs.
Cooling
Plant
Closed-loop liquid
Liquid
Deployed
Rack density
140 kW
H100-eq
—
WUE
0.27 L/kWh
fleet avg · 2025 · 4.7M m³/yr at 2 GW
Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.
West Texas Fairwater-class AI factory. Closed-loop liquid cooling, 2 GW announced.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Pecos, Texas, United States
Pecos, Reeves County, TX
31.423°, -103.493° · North America
Tenants / users
Microsoft, OpenAI
Notes
West Texas AI factory on the Fairwater thermal template.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.