Microsoft Pecos Campus

Microsoft Azure · Pecos

Planned IT
2 GW
Remaining
2 GW
$ / kW·mo
$54
White space
4M ft²

Inventory

0% occupied

Power

2 GWcampus

2 GW pipeline · 0 MW in use

White space

4M ft²total

4M ft² free · occupied

372k m² · 372k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live
Remaining2 GW
Utility feed
Campus / planned2 GW

Power cost

$54/kW·mo

6.6¢ industrial · 7.4¢ after PUE 1.12

Per MW·year
$648k
This site · 2 GW
$1.3B/yr
140 kW rack
$7,555/mo
3.2¢ cheapdear 22.4¢

2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $667M/yr less.

ERCOT industrial · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2028
Renewable match
70%
Rack density
140 kW
PUE
1.121.00 ideal · 1.60 typical
Power source
ERCOT West plus PPAs.

Cooling

Plant

Closed-loop liquid

Liquid

Deployed

Rack density

140 kW

H100-eq

WUE

0.27 L/kWh

fleet avg · 2025 · 4.7M m³/yr at 2 GW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.

West Texas Fairwater-class AI factory. Closed-loop liquid cooling, 2 GW announced.

Network carriers

7

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Pecos, Texas, United States

Pecos, Reeves County, TX

31.423°, -103.493° · North America

Tenants / users

Microsoft, OpenAI

Notes

West Texas AI factory on the Fairwater thermal template.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.