Planned
Hyperscale
Liquid cooling
Tier III

Microsoft Narvik

Microsoft / nScale / Aker · Narvik

Planned IT
300 MW
Remaining
300 MW
$ / kW·mo
$34
White space
600k ft²

Inventory

0% occupied

Power

300 MWcampus

300 MW pipeline · 0 MW in use

White space

600k ft²total

600k ft² free · occupied

56k m² · 56k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live
Remaining300 MW
Utility feed
Campus / planned300 MW

Power cost

$34/kW·mo

4.2¢ industrial · 4.6¢ after PUE 1.10

Per MW·year
$405k
This site · 300 MW
$121M/yr
80 kW rack
$2,698/mo
3.2¢ cheapdear 22.4¢

1.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $29M/yr less.

Norway NO4 · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2028
Renewable match
100%
Rack density
80 kW
PUE
1.101.00 ideal · 1.60 typical
Power source
Statnett hydro and wind.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

80 kW

H100-eq

WUE

0.27 L/kWh

fleet avg · 2025 · 710k m³/yr at 300 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.

Nordic hydro-powered AI campus with liquid-ready halls and free-air economization.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Narvik, Nordland, Norway

Narvik, Nordland, Norway

68.438°, 17.427° · Europe

Tenants / users

Microsoft, nScale

Notes

Announced 2025 with nScale and Aker. Arctic hydro plus free cooling.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.