Microsoft Narvik
Microsoft / nScale / Aker · Narvik
- Planned IT
- 300 MW
- Remaining
- 300 MW
- $ / kW·mo
- $34
- White space
- 600k ft²
Inventory
0% occupiedPower
300 MWcampus
300 MW pipeline · 0 MW in use
White space
600k ft²total
600k ft² free · — occupied
56k m² · 56k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$34/kW·mo
4.2¢ industrial · 4.6¢ after PUE 1.10
- Per MW·year
- $405k
- This site · 300 MW
- $121M/yr
- 80 kW rack
- $2,698/mo
1.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $29M/yr less.
Norway NO4 · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2028
- Renewable match
- 100%
- Rack density
- 80 kW
- PUE
- 1.101.00 ideal · 1.60 typical
- Power source
- Statnett hydro and wind.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
80 kW
H100-eq
—
WUE
0.27 L/kWh
fleet avg · 2025 · 710k m³/yr at 300 MW
Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.
Nordic hydro-powered AI campus with liquid-ready halls and free-air economization.
Network carriers
3On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Narvik, Nordland, Norway
Narvik, Nordland, Norway
68.438°, 17.427° · Europe
Tenants / users
Microsoft, nScale
Notes
Announced 2025 with nScale and Aker. Arctic hydro plus free cooling.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.