Expanding
Hyperscale
Liquid cooling
Tier III

Microsoft Azure Middenmeer AMS13

Microsoft Azure · Agriport A7 east

IT live
48 MW
Remaining
112 MW
$ / kW·mo
$106
White space
625k ft²

Inventory

30% occupied

Power

160 MWcampus

112 MW to commission · 48 MW in use

White space

2.1M ft²total

1.5M ft² free · 625k ft² occupied

194k m² · 135k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live48 MW
Remaining112 MW
Utility feed200 MW
Campus / planned160 MW

About 152 MW of the utility feed is cooling, conversion, and house load.

Power cost

$106/kW·mo

13.2¢ industrial · 14.5¢ after PUE 1.10

Per MW·year
$1.3M
This site · 48 MW
$61M/yr
30 kW rack
$3,180/mo
3.2¢ cheapdear 22.4¢

4.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $46M/yr less.

Agriport / TenneT 380 kV · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2023
Renewable match
85%
Rack density
30 kW
PUE
1.101.00 ideal · 1.60 typical
Power source
TenneT 380 kV Agriport / Eemshaven. Dual 380 kV plus on-site diesel. North Sea wind overlay. One of two Dutch hyperscale zones still permitted after the 2022 moratorium.

Cooling

Plant

Closed-loop liquid

Liquid

Deployed

Rack density

30 kW

H100-eq

—

WUE

0.27 L/kWh

fleet avg · 2025 · 114k m³/yr at 48 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.

Closed-loop Fairwater-class liquid. Two live halls, six more permitted.

Network carriers

10

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Middenmeer, North Holland, Netherlands

Agriport AMS13/14, Middenmeer, Hollands Kroon

52.812°, 5.029° · Europe

Tenants / users

Azure West Europe, AI

Notes

East-of-A7 expansion permitted April 2023. Two hyperscale halls live, six more in the pipeline toward 16 buildings on the polder. 50 ha more land banked 2025 plus 37.5 ha in 2026 next to a planned TenneT 380 kV substation. Complements the 2015 AMS07 campus.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.