Microsoft Azure Middenmeer AMS07

Microsoft Azure · Agriport A7 west

Microsoft Azure Middenmeer AMS07 facility
Wikimedia Commons / Hay Kranen · Source
IT live
80 MW
Remaining
40 MW
$ / kW·mo
$108
White space
536k ft²

Inventory

67% occupied

Power

120 MWcampus

40 MW to commission · 80 MW in use

White space

804k ft²total

268k ft² free · 536k ft² occupied

75k m² · 25k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live80 MW
Remaining40 MW
Utility feed150 MW
Campus / planned120 MW

About 70 MW of the utility feed is cooling, conversion, and house load.

Power cost

$108/kW·mo

13.2¢ industrial · 14.8¢ after PUE 1.12

Per MW·year
$1.3M
This site · 80 MW
$104M/yr
25 kW rack
$2,698/mo
3.2¢ cheapdear 22.4¢

4.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $78M/yr less.

Agriport / TenneT 380 kV · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2015
Renewable match
80%
Rack density
25 kW
PUE
1.121.00 ideal · 1.60 typical
Power source
TenneT 380 kV Agriport / Eemshaven. Dual 380 kV plus on-site diesel. North Sea wind overlay. One of two Dutch hyperscale zones still permitted after the 2022 moratorium.

Cooling

Plant

Closed-loop liquid

Liquid

Deployed

Rack density

25 kW

H100-eq

—

WUE

0.27 L/kWh

fleet avg · 2025 · 189k m³/yr at 80 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.

Closed-loop facility-scale liquid on AI halls; air economization on CPU buildings. Waste-heat to Agriport greenhouses.

Network carriers

10

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Middenmeer, North Holland, Netherlands

Agriport 570, 1775 TB Middenmeer

52.808°, 5.018° · Europe

Tenants / users

Azure West Europe

Notes

Original Agriport campus, opened November 2015. Azure West Europe AZ. 112,000 sqm. ~1.17 TWh campus draw in 2025, about 1 percent of Dutch electricity. One of two Dutch hyperscale zones still permitted. Pair to AMS13/14 east of the A7.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.