Microsoft Spain Central
Microsoft Azure · Madrid Cloud Region
- IT live
- 60 MW
- Remaining
- 30 MW
- $ / kW·mo
- $105
- White space
- 150k ft²
Inventory
67% occupiedPower
90 MWcampus
30 MW to commission · 60 MW in use
White space
225k ft²total
75k ft² free · 150k ft² occupied
21k m² · 6,968 m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 52.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$105/kW·mo
12.2¢ industrial · 14.4¢ after PUE 1.18
- Per MW·year
- $1.3M
- This site · 60 MW
- $76M/yr
- 40 kW rack
- $4,204/mo
3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $56M/yr less.
Spain industrial · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2024
- Renewable match
- 95%
- Rack density
- 40 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- Redeia plus Microsoft PPAs.
Cooling
Plant
Closed-loop liquid
Liquid
Deployed
Rack density
40 kW
H100-eq
—
WUE
0.27 L/kWh
fleet avg · 2025 · 142k m³/yr at 60 MW
Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.
Closed-loop liquid on AI halls; air economization on CPU buildings. Spain Central AZs.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Algete, Madrid, Spain
Algete / Meco / San Sebastián de los Reyes, Madrid
40.596°, -3.497° · Europe
Tenants / users
Azure, OpenAI inference (partial)
Notes
Microsoft's Madrid region across Algete, Meco and San Sebastián de los Reyes.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.