Microsoft La Porte
Microsoft Azure
- Planned IT
- —
- Remaining
- —
- $ / kW·mo
- $70
- White space
- —
Power
Power cost
$70/kW·mo
7.4¢ industrial · 9.6¢ after PUE —
- Per MW·year
- $843k
- This site
- —
2.3× the cheapest market (Iceland Landsvirkjun).
Indiana industrial · utility tariff × PUE, not colo list price.
- Redundancy
- —
- Opened
- —
- Renewable match
- —
- Rack density
- —
- Voltage
- —
- PUE
- —1.00 ideal · 1.60 typical
- Power source
- —
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
—
H100-eq
—
WUE
0.27 L/kWh
fleet avg · 2025
Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.
Cooling design not published by the operator for this site; typed air as the neutral default.
Network carriers
0No on-net carriers published.
On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
La Porte, Indiana, United States
41.611°, -86.723° · North America
Tenants / users
Microsoft
Notes
Microsoft Local (official community page): Microsoft is working through datacenter development in northern Indiana and has posted that it broke ground on its La Porte datacenter project. Capacity, investment and building count not published there. Coordinates: OSM relation 127359 (town center, approximate). Source: https://local.microsoft.com/communities/americas/indiana/
Compiled from public filings, operator pages, and reporting. Not an official operator specification.