Under construction
Hyperscale
Air cooled

Microsoft La Porte

Microsoft Azure

Planned IT
—
Remaining
—
$ / kW·mo
$70
White space
—

Power

IT live—
Remaining—
Utility feed—
Campus / planned—

Power cost

$70/kW·mo

7.4¢ industrial · 9.6¢ after PUE —

Per MW·year
$843k
This site
—
3.2¢ cheapdear 22.4¢

2.3× the cheapest market (Iceland Landsvirkjun).

Indiana industrial · utility tariff × PUE, not colo list price.

Redundancy
—
Opened
—
Renewable match
—
Rack density
—
Voltage
—
PUE
—1.00 ideal · 1.60 typical
Power source
—

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

—

H100-eq

—

WUE

0.27 L/kWh

fleet avg · 2025

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.

Cooling design not published by the operator for this site; typed air as the neutral default.

Network carriers

0

No on-net carriers published.

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

La Porte, Indiana, United States

41.611°, -86.723° · North America

Tenants / users

Microsoft

Notes

Microsoft Local (official community page): Microsoft is working through datacenter development in northern Indiana and has posted that it broke ground on its La Porte datacenter project. Capacity, investment and building count not published there. Coordinates: OSM relation 127359 (town center, approximate). Source: https://local.microsoft.com/communities/americas/indiana/

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.