Microsoft Kemps Creek
Microsoft Azure · Sydney AI Campus
- Planned IT
- 190 MW
- Remaining
- 190 MW
- $ / kW·mo
- $119
- White space
- 380k ft²
Inventory
0% occupiedPower
190 MWcampus
190 MW pipeline · 0 MW in use
White space
380k ft²total
380k ft² free · — occupied
35k m² · 35k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$119/kW·mo
14.2¢ industrial · 16.3¢ after PUE 1.15
- Per MW·year
- $1.4M
- This site · 190 MW
- $272M/yr
- 80 kW rack
- $9,537/mo
4.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $211M/yr less.
NSW NEM · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2026
- Renewable match
- 80%
- Rack density
- 80 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- Endeavour Energy. US$1.3bn, two buildings.
Cooling
Plant
Closed-loop liquid
Liquid
Deployed
Rack density
80 kW
H100-eq
—
WUE
0.27 L/kWh
fleet avg · 2025 · 449k m³/yr at 190 MW
Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.
Closed-loop liquid AI campus. Building Two completing 2026.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Kemps Creek, New South Wales, Australia
Kemps Creek, NSW
-33.880°, 150.790° · Oceania
Tenants / users
Microsoft, OpenAI inference (partial)
Notes
190 MW Sydney AI campus. Part of Microsoft's A$25bn Australia commitment (April 2026).
Compiled from public filings, operator pages, and reporting. Not an official operator specification.