Under construction
Hyperscale
Liquid cooling
Tier III

Microsoft Kemps Creek

Microsoft Azure · Sydney AI Campus

Planned IT
190 MW
Remaining
190 MW
$ / kW·mo
$119
White space
380k ft²

Inventory

0% occupied

Power

190 MWcampus

190 MW pipeline · 0 MW in use

White space

380k ft²total

380k ft² free · occupied

35k m² · 35k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live
Remaining190 MW
Utility feed
Campus / planned190 MW

Power cost

$119/kW·mo

14.2¢ industrial · 16.3¢ after PUE 1.15

Per MW·year
$1.4M
This site · 190 MW
$272M/yr
80 kW rack
$9,537/mo
3.2¢ cheapdear 22.4¢

4.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $211M/yr less.

NSW NEM · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2026
Renewable match
80%
Rack density
80 kW
PUE
1.151.00 ideal · 1.60 typical
Power source
Endeavour Energy. US$1.3bn, two buildings.

Cooling

Plant

Closed-loop liquid

Liquid

Deployed

Rack density

80 kW

H100-eq

WUE

0.27 L/kWh

fleet avg · 2025 · 449k m³/yr at 190 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.

Closed-loop liquid AI campus. Building Two completing 2026.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Kemps Creek, New South Wales, Australia

Kemps Creek, NSW

-33.880°, 150.790° · Oceania

Tenants / users

Microsoft, OpenAI inference (partial)

Notes

190 MW Sydney AI campus. Part of Microsoft's A$25bn Australia commitment (April 2026).

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.