Operational
Hyperscale
Air cooled
Tier III

Microsoft Dublin DB3

Microsoft Azure · Grange Castle

IT live
90 MW
Remaining
30 MW
$ / kW·mo
$147
White space
511k ft²

Inventory

75% occupied

Power

120 MWcampus

30 MW to commission · 90 MW in use

White space

682k ft²total

170k ft² free · 511k ft² occupied

63k m² · 16k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live90 MW
Remaining30 MW
Utility feed120 MW
Campus / planned120 MW

About 30 MW of the utility feed is cooling, conversion, and house load.

Power cost

$147/kW·mo

17.4¢ industrial · 20.2¢ after PUE 1.16

Per MW·year
$1.8M
This site · 90 MW
$159M/yr
12 kW rack
$1,768/mo
3.2¢ cheapdear 22.4¢

5.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $130M/yr less.

Ireland industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2009
Renewable match
80%
Rack density
12 kW
PUE
1.161.00 ideal · 1.60 typical
Power source
EirGrid plus PPAs.

Cooling

Plant

Free air

Liquid

Not deployed

Rack density

12 kW

H100-eq

WUE

0.27 L/kWh

fleet avg · 2025 · 213k m³/yr at 90 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.

Air economization at Grange Castle. Newer Irish AI halls are liquid-ready; this building is free-air.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Dublin, Leinster, Ireland

Grange Castle Business Park, Dublin

53.305°, -6.448° · Europe

Tenants / users

Azure, OpenAI inference (partial)

Notes

Microsoft's long-running Dublin campus. Irish grid constraints cap further expansion.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.