Microsoft Chile Central
Microsoft Azure · Santiago
- IT live
- 50 MW
- Remaining
- 0 MW
- $ / kW·mo
- $76
- White space
- 179k ft²
Inventory
100% occupiedPower
50 MWcampus
0 MW to commission · 50 MW in use
White space
179k ft²total
— free · 179k ft² occupied
17k m²
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 12.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$76/kW·mo
9¢ industrial · 10.3¢ after PUE 1.15
- Per MW·year
- $907k
- This site · 50 MW
- $45M/yr
- 25 kW rack
- $1,889/mo
2.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $29M/yr less.
Chile SIC · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2024
- Renewable match
- 95%
- Rack density
- 25 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- Chile hydro/solar.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
0.27 L/kWh
fleet avg · 2025 · 118k m³/yr at 50 MW
Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.
Hybrid plus liquid-ready AI halls.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Santiago, Santiago Metropolitan, Chile
Santiago Metropolitan Region
-33.450°, -70.680° · South America
Tenants / users
Azure
Notes
Microsoft Chile Central region.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.