Microsoft Azure Canada East
Microsoft Azure · Canada East
- IT live
- 28 MW
- Remaining
- 20 MW
- $ / kW·mo
- $40
- White space
- 250k ft²
Inventory
58% occupiedPower
48 MWcampus
20 MW to commission · 28 MW in use
White space
429k ft²total
179k ft² free · 250k ft² occupied
40k m² · 17k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 32 MW of the utility feed is cooling, conversion, and house load.
Power cost
$40/kW·mo
5¢ industrial · 5.5¢ after PUE 1.10
- Per MW·year
- $482k
- This site · 28 MW
- $13M/yr
- 20 kW rack
- $803/mo
1.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $4.9M/yr less.
Hydro-Québec Rate L · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2016
- Renewable match
- 99%
- Rack density
- 20 kW
- PUE
- 1.101.00 ideal · 1.60 typical
- Power source
- Hydro-Québec. Dual MV inlets plus on-site diesel. ~99.8 percent hydro (Rate L on large sites).
Cooling
Plant
Free air
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
0.27 L/kWh
fleet avg · 2025 · 66k m³/yr at 28 MW
Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Québec, Quebec, Canada
Greater Québec City (AZ undisclosed)
46.810°, -71.210° · North America
Tenants / users
Azure
Notes
Azure Canada East. Québec City dual-site to Canada Central. Hydro-Québec free-air. Pair to Vantage QC2.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.