Microsoft Azure Colombia
Microsoft Azure · Bogotá
- IT live
- 40 MW
- Remaining
- 40 MW
- $ / kW·mo
- $96
- White space
- 167k ft²
Inventory
50% occupiedPower
80 MWcampus
40 MW to commission · 40 MW in use
White space
333k ft²total
167k ft² free · 167k ft² occupied
31k m² · 15k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 60 MW of the utility feed is cooling, conversion, and house load.
Power cost
$96/kW·mo
11¢ industrial · 13.2¢ after PUE 1.20
- Per MW·year
- $1.2M
- This site · 40 MW
- $46M/yr
- 20 kW rack
- $1,927/mo
3.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $33M/yr less.
Colombia industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2025
- Renewable match
- 70%
- Rack density
- 20 kW
- PUE
- 1.201.00 ideal · 1.60 typical
- Power source
- Colombian grid plus PPAs.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
0.27 L/kWh
fleet avg · 2025 · 95k m³/yr at 40 MW
Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.
Azure Colombia region. Hybrid plus liquid-ready AI services halls.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Bogotá, Cundinamarca, Colombia
Cundinamarca, Colombia
4.710°, -74.070° · South America
Tenants / users
Azure, LatAm enterprise AI
Notes
Microsoft's Bogotá cloud region, ~80 MW planned.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.