Planned
Hyperscale
Liquid cooling
Tier III

Microsoft Argentina AI Region

Microsoft Azure · Buenos Aires

Planned IT
50 MW
Remaining
50 MW
$ / kW·mo
$74
White space
179k ft²

Inventory

0% occupied

Power

50 MWcampus

50 MW pipeline · 0 MW in use

White space

179k ft²total

179k ft² free · occupied

17k m² · 17k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live
Remaining50 MW
Utility feed
Campus / planned50 MW

Power cost

$74/kW·mo

8.6¢ industrial · 10.1¢ after PUE 1.18

Per MW·year
$889k
This site · 50 MW
$44M/yr
25 kW rack
$1,852/mo
3.2¢ cheapdear 22.4¢

2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $28M/yr less.

Argentina industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2028
Renewable match
60%
Rack density
25 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
Argentine grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

0.27 L/kWh

fleet avg · 2025 · 118k m³/yr at 50 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.

Planned Azure AI cloud region.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Buenos Aires, Buenos Aires, Argentina

Buenos Aires, Argentina

-34.610°, -58.420° · South America

Tenants / users

Azure

Notes

Microsoft Argentina AI region, ~50 MW planned.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.