Microsoft Argentina AI Region
Microsoft Azure · Buenos Aires
- Planned IT
- 50 MW
- Remaining
- 50 MW
- $ / kW·mo
- $74
- White space
- 179k ft²
Inventory
0% occupiedPower
50 MWcampus
50 MW pipeline · 0 MW in use
White space
179k ft²total
179k ft² free · — occupied
17k m² · 17k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$74/kW·mo
8.6¢ industrial · 10.1¢ after PUE 1.18
- Per MW·year
- $889k
- This site · 50 MW
- $44M/yr
- 25 kW rack
- $1,852/mo
2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $28M/yr less.
Argentina industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2028
- Renewable match
- 60%
- Rack density
- 25 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- Argentine grid.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
0.27 L/kWh
fleet avg · 2025 · 118k m³/yr at 50 MW
Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.
Planned Azure AI cloud region.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Buenos Aires, Buenos Aires, Argentina
Buenos Aires, Argentina
-34.610°, -58.420° · South America
Tenants / users
Azure
Notes
Microsoft Argentina AI region, ~50 MW planned.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.