Planned
Hyperscale
Liquid cooling
Tier III

Microsoft Spain North Aragón

Microsoft Azure · Aragón

Planned IT
200 MW
Remaining
200 MW
$ / kW·mo
$102
White space
400k ft²

Inventory

0% occupied

Power

200 MWcampus

200 MW pipeline · 0 MW in use

White space

400k ft²total

400k ft² free · occupied

37k m² · 37k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live
Remaining200 MW
Utility feed
Campus / planned200 MW

Power cost

$102/kW·mo

12.2¢ industrial · 14¢ after PUE 1.15

Per MW·year
$1.2M
This site · 200 MW
$246M/yr
80 kW rack
$8,194/mo
3.2¢ cheapdear 22.4¢

3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $181M/yr less.

Spain industrial · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2028
Renewable match
100%
Rack density
80 kW
PUE
1.151.00 ideal · 1.60 typical
Power source
Aragón wind and solar. Grid-filter decree under consultation.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

80 kW

H100-eq

WUE

0.27 L/kWh

fleet avg · 2025 · 473k m³/yr at 200 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.

Next-generation liquid-cooled AI campus. Permitting tied to Spain's data-center decree.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Zaragoza, Aragón, Spain

Aragón, Spain

41.649°, -0.889° · Europe

Tenants / users

Azure

Notes

Microsoft's Aragón expansion. Merlin also assembling land at Botorrita (144 MW).

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.