Microsoft Spain North Aragón
Microsoft Azure · Aragón
- Planned IT
- 200 MW
- Remaining
- 200 MW
- $ / kW·mo
- $102
- White space
- 400k ft²
Inventory
0% occupiedPower
200 MWcampus
200 MW pipeline · 0 MW in use
White space
400k ft²total
400k ft² free · — occupied
37k m² · 37k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$102/kW·mo
12.2¢ industrial · 14¢ after PUE 1.15
- Per MW·year
- $1.2M
- This site · 200 MW
- $246M/yr
- 80 kW rack
- $8,194/mo
3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $181M/yr less.
Spain industrial · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2028
- Renewable match
- 100%
- Rack density
- 80 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- Aragón wind and solar. Grid-filter decree under consultation.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
80 kW
H100-eq
—
WUE
0.27 L/kWh
fleet avg · 2025 · 473k m³/yr at 200 MW
Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.
Next-generation liquid-cooled AI campus. Permitting tied to Spain's data-center decree.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Zaragoza, Aragón, Spain
Aragón, Spain
41.649°, -0.889° · Europe
Tenants / users
Azure
Notes
Microsoft's Aragón expansion. Merlin also assembling land at Botorrita (144 MW).
Compiled from public filings, operator pages, and reporting. Not an official operator specification.