Under construction
Hyperscale
Liquid cooling
Tier III

Meta Sturgeon County

Meta · Alberta Industrial Heartland

Planned IT
1 GW
Remaining
1 GW
$ / kW·mo
$56
White space
3.7M ft²

Inventory

0% occupied

Power

1 GWcampus

1 GW pipeline · 0 MW in use

White space

3.7M ft²total

2M ft² free · 1.7M ft² occupied

346k m² · 186k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live—
Remaining1 GW
Utility feed1.9 GW
Campus / planned1 GW

Power cost

$56/kW·mo

6.8¢ industrial · 7.6¢ after PUE 1.12

Per MW·year
$667k
This site · 1 GW
$667M/yr
80 kW rack
$4,448/mo
3.2¢ cheapdear 22.4¢

2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $353M/yr less.

AESO Industrial Heartland · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2028
Renewable match
18%
Rack density
80 kW
PUE
1.121.00 ideal · 1.60 typical
Power source
AESO / Altalink. 970 MW interim large-load allocation plus dedicated Greenlight CCGT (932 MW FID, path 1,864 MW). Capital Power 250 MW ESA.

Cooling

Plant

Closed-loop liquid

Liquid

Deployed

Rack density

80 kW

H100-eq

80k

WUE

0.05 L/kWh

2026 · 438k m³/yr at 1 GW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Meta closed-loop disclosure, Sturgeon County.

Closed-loop campus cooling charged once at construction. Meta: effectively zero makeup water after fill — a large radiator, not evaporative towers.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Sturgeon County, Alberta, Canada

Highway 643 and Highway 825, Sturgeon County, AB

53.796°, -113.318° · North America

Tenants / users

Meta AI, core products

Notes

First Meta data center in Canada, 33rd globally. C$13 billion, 1 GW IT, 1,900 acres. AESO 970 MW interim allocation, Capital Power 250 MW ESA (H2 2028), Greenlight 932 MW gas CCGT FID (2030) with AUC envelope to 1,864 MW. Closed-loop, not Hydro-Québec. Complements AWS ca-west-1 Calgary — Alberta gas-AI, not Québec hydro-AI.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.