Under construction
Hyperscale
Air cooled

Meta Singapore

Meta

Planned IT
—
Remaining
—
$ / kW·mo
$201
White space
—

Power

IT live—
Remaining—
Utility feed—
Campus / planned—

Power cost

$201/kW·mo

21.2¢ industrial · 27.6¢ after PUE —

Per MW·year
$2.4M
This site
—
3.2¢ cheapdear 22.4¢

6.6× the cheapest market (Iceland Landsvirkjun).

Singapore EMA · utility tariff × PUE, not colo list price.

Redundancy
—
Opened
—
Renewable match
100%
Rack density
—
Voltage
—
PUE
—1.00 ideal · 1.60 typical
Power source
Singapore grid. Meta-supported projects in Singapore add 250+ MW of renewable energy; electricity matched 100% with clean and renewable energy (Meta).

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

—

H100-eq

—

WUE

0.18 L/kWh

fleet avg · 2023

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Meta 2023 Sustainability Report.

Cooling design not published on Meta's info sheet; typed air as the neutral default.

Network carriers

0

No on-net carriers published.

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

0

No public-cloud on-ramp published.

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Singapore, West Region, Singapore

30 Sunview Way, Boon Lay, Singapore 628051

1.317°, 103.703° · Asia

Tenants / users

Meta

Notes

Broke ground 2018; investment SGD 1.4B+ (Meta). Meta's info sheet still describes it as future (will be part of the fleet); status set to construction pending confirmation. Capacity not published. Coordinates: OSM way 941784004 (facility footprint). Sources: https://datacenters.atmeta.com/all-locations/ ; https://datacenters.atmeta.com/asset/singapore-data-center-info-sheet/

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.