Meta Prineville
Meta · Prineville
- IT live
- 150 MW
- Remaining
- 50 MW
- $ / kW·mo
- $41
- White space
- 750k ft²
Inventory
75% occupiedPower
200 MWcampus
50 MW to commission · 150 MW in use
White space
1M ft²total
250k ft² free · 750k ft² occupied
93k m² · 23k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 50 MW of the utility feed is cooling, conversion, and house load.
Power cost
$41/kW·mo
5.2¢ industrial · 5.6¢ after PUE 1.08
- Per MW·year
- $492k
- This site · 150 MW
- $74M/yr
- 15 kW rack
- $615/mo
1.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $28M/yr less.
BPA Central Oregon · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2010
- Renewable match
- 100%
- Rack density
- 15 kW
- PUE
- 1.081.00 ideal · 1.60 typical
- Power source
- PacifiCorp plus hydro and wind.
Cooling
Plant
Evaporative
Liquid
Not deployed
Rack density
15 kW
H100-eq
—
WUE
0.18 L/kWh
fleet avg · 2023 · 237k m³/yr at 150 MW
Operator fleet average applied to this hall — not a site meter. Meta 2023 Sustainability Report.
Vanadium flow battery plus evaporative cooling. Meta's original custom data center.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Prineville, Oregon, United States
Prineville, Crook County, OR
44.294°, -120.836° · North America
Tenants / users
Meta
Notes
Open-sourced hardware and facility designs came out of this campus.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.