Expanding
Hyperscale
Liquid cooling
Tier III

Meta Odense

Meta · Tietgenbyen

IT live
90 MW
Remaining
90 MW
$ / kW·mo
$90
White space
938k ft²

Inventory

50% occupied

Power

180 MWcampus

90 MW to commission · 90 MW in use

White space

1.9M ft²total

938k ft² free · 938k ft² occupied

174k m² · 87k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live90 MW
Remaining90 MW
Utility feed225 MW
Campus / planned180 MW

About 135 MW of the utility feed is cooling, conversion, and house load.

Power cost

$90/kW·mo

11.2¢ industrial · 12.3¢ after PUE 1.10

Per MW·year
$1.1M
This site · 90 MW
$97M/yr
20 kW rack
$1,799/mo
3.2¢ cheapdear 22.4¢

3.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $69M/yr less.

Denmark DK1 · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2019
Renewable match
100%
Rack density
20 kW
PUE
1.101.00 ideal · 1.60 typical
Power source
Energinet. Dual feeds. Wind-heavy Danish grid plus Viking Link.

Cooling

Plant

Free air

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

0.18 L/kWh

fleet avg · 2023 · 142k m³/yr at 90 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Meta 2023 Sustainability Report.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Odense, Funen, Denmark

Tietgenbyen, Odense

55.354°, 10.428° · Europe

Tenants / users

Meta

Notes

56,500 sqm Funen campus. Waste heat already serves ~7,000 homes, targeting 12,000. AI-ready expansion. Complements Lulea already in the index.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.